General

Name: Jagdulla Peaking Run-of-River Hydroelectric Project (106 MW)
Location: Jagdulla & Mudkechula Rural Municipality, Dolpa District, Karnali Pradesh
River: Jagdulla River

Hydrology

Catchment Area: 633.83 Sq. Km
Design Discharge: 16.20 m3/s
Minimum Monthly Flow: 4.67 m3/s
Design Flood (Q1000): 1141 m3/s

Access Road

Chaurjhari-Dolpa Highway at Triveni

Headworks

Location: Hurikot -1, Jagdulla Rural Municipality
Dam: Dam (3 nos. opening) with emergency spillway
Dam Crest Level: 2678.00 masl
Spillway Crest Level: EL 2696.00 masl
Inundation Area: 48,276 m2
Settling Basin: Intermittent Flushing (120 m (L) x 13 m (B))

Powerhouse

Location: Ila - 4, Mudkechula Rural Municipality
Headrace Tunnel Length: 6.135 Km (2.9mDia)
Pressure Shaft: 1406.69m (2.1m Diameter)
Powerhouse: Underground (64m X 12m X 28.6m)
Turbine: Pelton, Vertical Axis (3 units)

Tailrace

Length: 266m
Size: 5m (B) X 5m (H)

Energy

Installed Capacity: 106 MW
Annual Energy: 615032 GWh
Gross Head: 789.6 m